Campus Renovations Over the Term Break
- jenelysanjuan
- Jan 30
- 1 min read
The AISHK campus underwent significant renovations to enhance learning spaces, student wellbeing and shared facilities.
The cafeteria was upgraded and expanded, extending onto the Sports Terrace to provide additional indoor, air-conditioned seating. New lighting, furniture, an improved coffee shop and a noodle bar were introduced.
The Admissions Office was relocated to the first floor, creating a more accessible and welcoming space for families and visitors.
Three classrooms on the 4F were redesigned to create more flexible primary learning environments.
On the 8F, the Secondary reception, office, and teachers’ workspace were refitted and reconfigured, with an expanded reception area and the integration of Student Services and the LEC.
Phase One of the Wellness Wing commenced with the repurposing of the Ground Floor tuckshop into a classroom, human movement lab or gym and the PDHPE and Sport Office, bringing the department together in one accessible space.












